Click here to open a PDF version of this tip sheet.
This document is intended to assist with resolving unpermitted construction violations. If you have received a Notice of Violation or a Request for Voluntary Correction of Violation from Permit Compliance, this tip sheet will help you get started.
Construction and permits
The Tacoma Municipal Code requires a permit for most construction activities, including home remodeling, repairs, alterations, window replacement, deck repairs, installation of new plumbing fixtures, and removal or demolition of structures. Other activities, such as clearing vegetation from a wetland or pruning a tree on the right-of-way, require a critical area permit or a right-of-way tree permit.
If Planning and Development Services (PDS) receives a complaint regarding unpermitted construction, Permit Compliance may serve a Notice of Violation to the property owner, which may include a Stop Work Order or a Compliance Order. The Notice of Violation will direct the property owner to obtain permits for the work performed.
Please note: Electrical work is regulated by Tacoma Public Utilities, which is not a City Department. However, some electrical projects require permits from PDS, such as installation of solar panels or electrified fences.
Where to begin
The first step is to determine which permits are required to resolve the violation. The permits you require depend on the nature of the work that was performed.
For example, if a new window is installed in a single-family house, a residential building alteration permit or “BLDRA” permit is required. If a sewer repair was performed without a permit, then a “SEWER” permit is required.
Once you know which permits you need, you can start your applications. Most permit applications require the following documents submitted together in PDF format:
- A floor plan showing the layout of the house or other structure where the work took place, with details on where the alterations were performed
- A site plan showing the entire property from a bird’s eye view, with labeled property lines and dimensions
- A written scope of work that provides details for all planned construction activity
- A framing diagram for new framing or structural elements, if applicable
- A reference to the record number associated with your case, such as VIOLXX-XXXX or CASEPCXX-XXXX
Some permit applications are more complex and may require meetings with staff to determine the steps to resolution. These applications can involve critical areas, shorelines, or discretionary Land Use permits related to variances or rezoning.
Application documents
PDS uses the Accela platform for permit applications and review. To submit a permit application, you will need to create an Accela account at https://aca.accela.com/tacoma/.
Your application should meet the electronic file standards and the drawing standards. All documents must be flattened and submitted in full-size, one-to-one format. Drawings must be submitted as black and white PDF documents. Scanned plans must be legible and to scale. Zip files are not accepted.
Permit Office staff are available to answer questions and assist you with your application. You can schedule an in-person or virtual appointment with the Permit Office by visiting www.tacomapermits.org or calling 253-591-5030. The Permit Office is open for walk-in appointments Monday through Thursday, 9:00 AM to 1:00 PM, at 747 Market Street in Tacoma.
Once your permit is approved, paid for, and issued, you can proceed with construction. Please remember to call for the appropriate inspections as work proceeds. You can schedule inspections via text, calling, or online. Instructions for scheduling inspections are online at www.tacomapermits.org/inspections.
When your permits have passed all required inspections (including final inspection), you can email permitcompliance@tacoma.gov to have your case closed out.
Additional information
- Proof of ownership may be required if the permit applicant is not listed on Pierce County Assessor records for the property.
- Some permits require a licensed professional to be identified in the permit application. The licensed professional must have a valid Washington State UBI number and active professional license.
- The Tip Sheet Library may be helpful to you as you work on your application – especially the “Electronic File Standards” tip sheet and the “Drawings: Site Plans, Floor Plans and Elevations” tip sheet. To view the Tip Sheet Library, visit www.tacomapermits.org/tip-sheet-index.
- Code Compliance cases are different from Permit Compliance cases. In general, Code Compliance cases pertain to the nuisance code, the noise ordinance, or derelict and substandard buildings. For information regarding a Code Compliance case, email codecompliance@tacoma.gov.
Example of floor plan

Example Site Plan




